Progress on the construction of ETORKI drying chambers is in full swing

Reading time 2 minutes
The construction of the new drying chambers for ETORKI Industria de la madera in Spain is progressing steadily. With this project, BES Bollmann is realizing a modern and efficient drying installation that is fully tailored to the requirements of the wood processing industry.
Over the past few weeks, the steel structures have been further constructed, and the scale of the installation on site is becoming increasingly visible. Recent images clearly show how the main frame of the drying chambers is taking shape, including the installation of ventilation components and other structural elements that form the core of the drying system.
This new generation of drying chambers is designed with a focus on optimal air circulation, energy efficiency, and a uniform drying process. As a result, the installation contributes to higher product quality, shorter drying times, and a reliable, reproducible end result.
Step by step, the project is approaching the next phase. While the exterior is increasingly taking shape, work is in full swing behind the scenes on the technical installations and controls that ensure maximum control over the drying process.
Thanks to all colleagues and partners contributing to this project. Together, we are working on a future-proof solution for industrial drying. We look forward to sharing the next milestones and results soon. 💪




