IPS – Germany – Essen – Bottrop

Wood drying installation for pallet producer

CLIENT

IPS (International Pallet Services)

INDUSTRY

Wood industry

WOOD TYPE

Pallets

DRYING CHAMBER CONTROL

Tromatic 910

Technology

Drying and HT treatment of pallets

LOCATION

Germany

Turnkey Wood Drying Installation

BES Bollmann has completed a large-scale turnkey project for leading pallet manufacturer IPS in Essen, Germany. The project included five new drying kilns and a fully integrated energy system, designed for the efficient drying and heat treatment of pallets.

The challenge: an integrated solution for large-scale capacity expansion

IPS had the ambition to significantly expand its production and treatment capacity. This required not only new, high-performance drying kilns, but also a powerful and fully integrated energy system capable of supporting the entire process. The challenge was to implement this complex project seamlessly with a single, central partner who could take full responsibility for both the drying technology and the complete energy supply.

Drying Kilns
Drying Kilns BES Bollmann

A complete turnkey project

In close collaboration with energy specialist KARA, BES Bollmann delivered a complete turnkey solution perfectly tailored to the needs of the pallet industry. The project included:

 

  • Vijf nieuwe, hoogwaardige Drying Kilns, specifiek ontworpen voor het drogen en HT-behandelen van pallets.

  • Een krachtige, houtgestookte ketelinstallatie van KARA die de warmte levert voor het gehele systeem.

  • Het volledige leidingwerk dat de ketel verbindt met de Drying Kilns en andere bedrijfsonderdelen.

 

What makes this project particularly special is that the residual heat from the system is also used to heat the production halls, ensuring maximum energy efficiency. The entire drying process is managed by the robust and reliable Bollmann 910 control system.

 

The project was further completed by the relocation of an existing drying kiln, giving the Essen site an impressive total capacity of six drying kilns.

PROJECT FEATURES

  • A drastic increase in drying and treatment capacity
  • A sustainable and cost-efficient energy system by using wood as fuel and utilizing residual heat
  • A fully integrated solution with a single point of contact, ensuring simplicity in management and maintenance
  • A process that guarantees consistent quality for the HT treatment (ISPM 15) of their pallets
  • Prio regulation - Heat and drying solution from BES Bollmann and Kara Future Energy systems
  • An existing room has been transferred from another location and integrated into the current system

Technical specifications

Quantity & Type

5x new pallet drying kilns

Software system

Tromatic 910 – the new generation of control systems for drying processes.

Particulars

Turnkey project in collaboration with KARA, including wood-fired boiler, pipework and hall heating

There is often more possible
than you think

Contact us and discover how our smart drying solutions contribute to sustainable, efficient, and future-proof production processes, delivered worldwide, with guaranteed results.